HVAC Package Supplier for onshore industries and nuclear power plant with Project Management,
Engineering, Procurement, Manufacturing, Installation and Commissioning services.

(Total 57)

NO PROJECT LOCATION ITEM SCOPE OWNER END USER PROJECT PERIOD
57 OUMACHE III 1,300 MW CCPP Project Algeria AHU: 12sets, ACCU: 12sets, RTU:14sets, ASU:12sets, SAC: 109sets CTHU: 10sets, FAN: 215sets, Control part: 1 Lot, Electric Duct Heater: 10set, Electric Unit Heater: 78sets, Humidifier: 10sets P HYENCO Hyundai E&C Ongoing (2020.10 ~ 2023.05)
56 Algeria Chiller Package Project Algeria Air cooled water Chiller: 2sets, Chilled water pump: 4 sets, Heat Exchanger unit: 4 sets, Expansion tank: 2 sets, Control Part, 4sets P HYENCO Hyundai E&C Ongoing (2021.11 ~ 2022.12)
55 Uzbekistan Gas To Liquid Project Uzbekistan AHU: 19sets, ACCU: 18sets, PU: 6sets, CFU: 9sets, CCU: 12sets, SAC: 73sets, Fan: 166sets, Steam H/E: 15sets, HWDH: 38sets, Electric Duct Humidifier: 5sets, SUH: 112sets, VAV: 17sets, CAV: 18sets, Blast Protection Damper: 15sets, Expansion Tank: 21sets, St P Oltin Yo'l GTL Hyundai Engineering Finished (2018.01 ~ 2019.08)
54 VinhTan 4 Extension Thermal Power Plant Project (600MW) VIETNAM AHU : 4 sets, ACCU : 4 sets, RTU : 4sets, SAC : 16 sets, Fan : 44 sets P EVN Doosan Finished (May. 2017 ~ Mar. 2018)
53 Golon Gas Project PANAMA Packaged Air Conditioner : 8 sets, CTHU : 2 sets, FFU : 4 sets Exhaust Fan(Ex-proof) : 2 sets, Duct & Damper, Bulk, Electric : 1 LOT P AES Posco E&C Finished (Jan. 2017 ~ Aug. 2017)
52 VinhTan 4 Thermal Power Plant Project (600MW x 2) VIETNAM AHU : 4 sets, ACCU : 4 sets, RTU : 4sets, SAC : 108 sets, Fan : 105 sets P EVN Doosan Finished (Jun. 2015 ~ Mar. 2017)
51 Zubair Project(E-house) IRAQ Packaged Air Conditioner(Ex-proof) : 2 sets, Exhaust Fan(Ex-proof) : 4 sets, Exhaust Fan : 1 set EPC ENI Samyang Finished (2016)
50 Satah Al Razboot(SARB) #4 Project(E-HOUSE) UAE Roof Top Unit : 27sets, Chemical Filter Unit : 6sets Blast Damper : 27sets, Pressurization Unit : 3sets EPC ADMA-OPCO Hyundai E&C Finished (2015~2016)
49 Zubair Project(LER 3 building) IRAQ Packaged Air Conditioner : 6 sets, Sand Trap Box : 3 sets, Panel(Power, Control) : 3 sets EPC ENI Samyang Finished (2015~2016)
48 West Qurna CPPB Project IRAQ HVAC SYSTEM (Included Roof top unit : 2sets, PAC : 4sets ) EPC LUKOIL Hyundai Finished (Sep. 2014 ~ Mar. 2015)
47 Clean Fuels Project KUWAIT Roof top unit(20RT~30RT) : 6 sets Chemical filter : 3 sets, Inertial filter /w bleed fan : 3 sets Explosion proof fan : 6 sets, Duct & Damper, Bulk, Electric : 1 LOT EPC KNPC KHAN Finished (Apr. 2014 ~ May. 2015)
46 West Qurna Field 2nd Phase Project IRAQ Roof top unit(20RT~32RT) : 20 sets PAC(10RT) : 9 sets, Inertial filter /w bleed fan : 10 sets Explosion proof fan : 20 sets, Duct & Damper, Bulk, Electric : 1 LOT EPC LUKOIL Hyundai Finished (Jan. 2013~Jun. 2013)
45 IGD DAS Project UAE Damper(Volume Control, Non Return, Pressure Relief, Fire, Gas, Blast, Diffuser, Register, Sound Attenuators, Louver, Sand Trap) : 1 LOT P ADGAS Hyundai Finished (2011 ~ 2012)
44 SHWE field development MYANMAR Roof top unit(8RT ~ 61RT) : 13 sets, PAC & Split A/C(1RT ~ 8RT) : 20 sets, Fan(Wall, Duct in line, Roof) : 67 sets EPC MOGE Hyundai Finished (May. 2010 ~ 2012)
43 RAS DJINET CCPP Project (400MW x 3) ALGERIA P2 Bulk P Sonelgaz SPE Daewoo E&C Finished (Jan. 2014 ~ Oct. 2016)
42 STX NRC Diesel Power Plant Project (7.5MW x 12) IRAQ Air Washer Unit(126,665 CMH, 469kW) : 12 sets P + Supervisor NRC STX Finished (2012)
41 Mong Duong 2_Coal Fired Power Project (560MW x 2) VIETNAM Roof top unit(3RT ~ 86RT) : 44 sets AHU(30~40RT ) : 9 sets PAC & Split A/C(1RT ~ 16RT) : 82 sets, Fan(Wall, Roof, Duct in line, Smoke, Explosion proof) : 290 sets Duct & Damper, Bulk, Electric : 1 LOT EPC AES-VCM Doosan Finished (2012 ~ 2015)
40 Raipur TPP Coal Fired Power Plant Project (685MW x 2) INDIA Chiller Unit(90RT) : 3 sets, AHU(110RT) : 2 sets Air Washer Unit(300,000 CMH) : 8 sets PAC & Split A/C(1RT ~ 40RT) : 44 sets FAN(Wall, Roof, Duct in line) : 122 sets Duct & Damper, Bulk, Electric : 1 LOT EPC GMR Doosan Finished (Apr. 2011 ~ 2015)
39 Jordan Research & Training Reactor Project JORDAN AHU(17RT ~ 69RT) : 6 sets, Chiller Unit(88RT) : 3 sets PAC(5RT ~ 35RT) : 15 sets, Fan : 51 sets Sand Removal Filter : 6 sets, Air Cleaning Unit : 2 sets Filter Train : 28 sets, Hepa Filter Box : 4 sets P JAEC Daewoo E&C Finished (2013)
38 Braka Nuclear Power Plant Units 1&2 UAE Air Cleaning Unit : 32 sets, Electric Duct Heater : 32 sets P ENEC KEPCO Finished (2012 ~ 2021)